NIL DESPERANDUM.
The present contractors in tbo mine have entered into * further agreement with Iho company to sink the. main shift* ono hundred feot, for tho sum of £3 per foot. Tbey aro now cutting out ft cliambor preparatory to starting, nnd should the roof continue down, according lo expectations, during tbo time of sinking, it is tho intention of tbo compiny to substitute (ho present modo of win ling wbieb is dono by horse power, and therefore both ■dow snd expensive, by constructing a reversible wator wheel.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/IT18781115.2.9
Bibliographic details
Ngā taipitopito pukapuka
Inangahua Times, Volume 19, 15 November 1878, Page 2
Word count
Tapeke kupu
88NIL DESPERANDUM. Inangahua Times, Volume 19, 15 November 1878, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.