NIL DESPERANDUM.
The contractors for hailing the shaft have made s start, hut owing to rh* Aepth of ' water in the mine it will probaMy take a month or tire weeks to thoroutfhly drain tho works. It is the intention of the directors as soon as this is accomplished to vigorously prosecute operations, and as there is a laige body of gold bearing Btoue. immediately available, no time will toe lost in getting out a crushing.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/IT18850420.2.6.4
Bibliographic details
Ngā taipitopito pukapuka
Inangahua Times, Volume X, Issue 1537, 20 April 1885, Page 2
Word count
Tapeke kupu
76NIL DESPERANDUM. Inangahua Times, Volume X, Issue 1537, 20 April 1885, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Log in