UNITED ALPINE.
J«BI"AT, tt-ptember 3. The usu-il weekly partial cleaning at this battery was not proceeded with yeaterd-iv, owing to the monthly c!e«Min:r "p t'kisig plawnrxt Wednesday. Although tfie contract works in connection with the head-race for battery are now out of hand, there is yet a piece of Burning of about four chains to connect with the battery from the tunnel, and when everything is? ready for the connection a delay of only two or three days will suffice to complete the work. At the mine daring the week the usual output of stone has been maintained. At the sonth end of the workings th** small reef is showing indications of giving out, which is not considered of much consequence by the mine tninager, as it has always been small aid the country very hard. There is no sign of any stone yet in the small crosscut which is being driven from the top stone ; the con >• try iseasv, »»nt not yet like the lower crosscut where the stone was got formerly.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/IT18860906.2.7.1
Bibliographic details
Ngā taipitopito pukapuka
Inangahua Times, Volume XI, Issue 1753, 6 September 1886, Page 2
Word count
Tapeke kupu
173UNITED ALPINE. Inangahua Times, Volume XI, Issue 1753, 6 September 1886, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Log in