D.—No. 22.

Bridges. £ s. d. £ a. d. £ s. d. £ s. d. Brought forward ... ... Brought forward Private Road Bridge. Embankments — continued. Excavation for Cills and Re- Soiling Slopes of Embankments filling Trenches, 6c. yds. at 17,000 sup. yds. at 2d 14113 4 ls. 6d 0 9 0 Timber in Cills and Beams, 9,548 5 0 101 cubic ft. at 4s 20 4 0 Pitching Slopes, 1,320 sup. yds. Timber in Planking, including at 35... ... ... ... ... ... 198 0 0 Spikes, 72 cubic ft. at 4s. ... 14 8 0 Formation, including Side Timber in Parapet and Ballast Ditches, 855 chs. at 9s. ... ... ... 384 15 0 Beams, 17 cubic ft. at 4s. ... 3 8 0 Ditches:— Iron in Straps and Bolts, 36 lbs. Ditches shown on Drawings, 60 at6d. 0 18 0 chs. at 15s 45 0 0 Painting and Tarring, allow ... 5 0 0 Ditches at undefined places, 44 7 0 100 chs. at 14s 70 0 0 Bridge over Kaikorai, at 3-61: — 115 0 0 Excavation, 15 c. yds. atls. 6d. 12 6 Level Crossings : — Concrete in Foundations, 3 c. Gates and Wickets complete, yds. at 35s 5 5 0 4pairsat4oos 80 0 0 Rubble Masonry in Cement, 22 Ordinary Crossings complete, c. yds. at 30s 33 0 0 10 pairs at 200s 100 0 0 Cement Plastering, 6 sup. yds. — 180 0 0 at 3s. " ... 0 18 0 Timber in Wall Plates, Hi c. ■ Roai Alterations. yds. at 4s 250 District Road: — Iron in Bed Plates, 63 lbs. at Earthwork, including formation Is 3 3 0 Cuttings, 900 c. yds. atls 45 0 0 Iron in Rods and Spikes, 41 lbs. at 6d. 10 6 Main South Road: —• Carriage and Erection of Earthwork, including formation Girders, allow 15 0 0 Cuttings, 220 c. yds. at 15.... 11 0 0 —— 61 14 0 Pitching and Metalling, 40 1. Bridge over Kaikorai, at 4-7 :— yds. at 10s 20 0 0 Excavation, 15 c. yds. at ls. 6d. 12 6 310 0 Concrete in Foundations, 3 c. District Roads :— ft. at 355. ... ... ... 550 Earthwork, including formation Rubble Masonry in Cement, 30 Cuttings, 1,200 c. yds. at lOd 50 0 0 c. yds. at 30s. 45 0 0 Where directed — Earthwork, Cement Plastering, 6 sup. yds. including formation, 2,000 c. at 3s. 0 18 0 yds.atlOd 83 6 8 Timber in Wall Plates, 11J c. Metalling, 500 c. yds. at ss. 6d. 137 10 0 ft. at 4s 2 5 0 220 16 8 Iron in Bed Plates, 63 lbs. at ls. 3 3 0 Sridaes Iron in Rods and Spikes, 41 lbs. t> -j t ~ ,-.' , ,„ „„ ,». r 106 Bridge over Lovel s Creek, at 3-27:— Carriage" and ' Erection of Piles, including Hooping, DrivGirders, allow 15 0 0 T' "wl i S - US ° m ii n Timber in Walmgs and Braces, Culverts and Drains:- „V*^^» ."; 20 9 6 I Culvert, including Excava- T™ber m Beams > 120 c- ft' at „, .-. tion, 241. yds. at £11 ... 264 0 0 T 4s \ "• „•" "• ••• 24 0 0 II Culverts, including Excava- Ir™m Plle Shoos > 120 lbs- at „. „ tion, 1701. yds. at £410s ... 765 0 0 t cv"' -oil j"o -t '" 1 Culvert, including Excava- B t' and SpikeS ' «. „ tion, 11 1. yds. at £4 ... 44 0 0 300 lbs. at 5d 65 0 Box Drains, including Excava- Tarring, allow 2 10 0 tions, 501. yds. at 10s. ... 25 0 0 . bJ lz 6 474 10 0 Bridge over Stoney Creek, at 4-13 : — Maintenance for three months, 1 Man ... 30 0 0 Piles, including Hooping, Driving, &c, 144 1. ft. at 2s. ... 14 8 0 £4 865 10 6 Timber in Walings and Braces, ■ 91 c. ft. at 4s. 6d 20 11 9 CLUTHA CONTRACT. Timber in Beams, 120 c. ft. at Tender of McLeod and Co., £12,949 2s. llf<2. T 4s \ "'., ••''■ "• ••• 24 0 0 ■ . J ' ' , * , Iron m Pile Shoes, 120 lbs. at Fencing:— £ b. d. £ s. d. 4( j 2 0 0 Turf Fencing, 930 chs. at 18s. 837 0 0 Iron; ' in " gt "^ B £ t Post, Rail, and Wire Fencing, Spikes, 300 lbs. at sd. ... 65 0 640 chs. at 25s 800 0 0 Tarring, allow 2 10 0 1,637 0 0 go, 24 g Clearing Line, 855 chs. at ss. ... 213 15 0 Cuttings : —■ District Road Bridge over Railway, at 7-75 :— 8,140 c. yds. at Bid 288 5 10 Excavation for Cills and Re--60 c. yds. at lOd 2 10 0 filling Trenches, 18 o. yds. 1,000 c. yds. at 9d 37 10 0 atls 0 18 0 118,050 c. yds. at 7d. ... 3,443 2 6 Timber in Cills and Plates, 681 15,210 c. yds. at 7id. ... 475 6 3 c. ft. at 3s 10 5 6 7,810 c. yds. at 8d 260 6 8 Timber Uprights and Bracing, 23,360 c. yds. at 6d 584 0 0 1521 o. ft. at 4s 30 10 0 6,660 c. yds. at ls. 6d. ... 499 10 0 Timber Beams and Struts, 163 5,590 11 3 eft. at 2s. 6d 20 7 6 Embankments:— Timber Planking, including 44,750 c. yds. at 2d 372 18 4 Spikes, 190 c. ft. at 3s. ... 28 10 0 11,480 c. yds. at 4d 191 6 8 Timber Parapets and Ballast 7,900 c. yds. at 8d 263 6 8 Beams, 76 c. ft. at 3s. ... 11 8 0 9,500 c. yds. at 5d 197 18 4 Iron in Straps and Bolts, 280 51,740 c. yds. at 3d 646 15 0 lbs. at 6d 7 0 0 28,130 c. yds. at 21d. ... 293 0 6 Painting and Tarring, allow ... 3 0 0 1,965 5 5 111 19 0 Carried forward ... ... Carried forward

14

ENGINEERS' ESTIMATES AND CONTRACTS

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert