I.—9a.

82

wages since the break, and we are no further ahead than we were then. We have at present stopped work, as the ground is all on the move and unsafe to work. We will not make a start again pending your reply, which we sincerely hope will be favourable. We have, &c, John McLean and Son, Contractors, Makarau Contract, Helensville Northwards Eailway. 0. E. Vickerman, Esq., Eesident Engineer, Public Works, Auckland.

EXHIBIT No. 22. Memorandum for the Engineer-in-Chief. Makarau Tunnel. —The contractors, Messrs. J. McLean and Son, have written to me asking my approval and consent to stop the driving of the tunnel for six or seven months, to enable the ground round the present "creep" to consolidate, and give them a chance to pick up the length that has ■caved in, as already reported. They have to fight a very bad pressure at present, as the water is more or less all through the material, and the pressure is very bad, both on top and at the sides. The material runs like porridge, and is certainly very bad indeed, to contend with. It is not the top pressure, which is also very great, so much as the side pressure they complain of. In putting the drive in, they cannot (see " A " on the sketch) open the face to advance, as the stuff starts and runs and drives them out. This has occurred several times, and contractor has now come to the conclusion to try and let the ground settle. I do not quite agree with this, as the break in the ground up to the surface has cut all the water-leads, and the water will always come down here; and as long as the water gets at this material it will maintain this soft state. Probably by driving heavier slabs well ahead this might be stopped, but the contractor seems to have lost heart about it, and has written this letter, copy of which I attach. Overseer Witheridge does not seem to think there would be any improvement by waiting, and also thinks it can be done with heavier slabs. I attach a rough sketch. Contractors were increasing the size of the bottom-heading, and would then have to drive a top-heading on top of it. I should be glad to see you, or be instructed what to do. Chas. E. Vickeeman, Eesident Engineer. Public Works Office, Auckland, sth June, 1893.

EXHIBIT No. 23. Memorandum for the Engineer-in-Chief. Makaeau Tunnel.—The contractors, J. McLean and Son, have not attempted to make a further start at this tunnel since you saw it early in the month of June. I forwarded a copy of their letter to you of the 2nd June, 1893, with my memorandum, 43/118, of the sth June. The weather here still continues unusually wet, but, still, there is nothing to prevent the work going on. Do you wish me to take any further action in the matter ? Chas. E. Vickerman, Eesident Engineer. Public Works Office, Auckland, Ist July, 1893.

EXHIBIT No. 24. Memorandum for the Engineer-in-Chief. Makahau Tunnel.—ln further connection with my memorandums of the sth June and Ist July, I have to report that nothing has been done at the tunnel, which stands just as you stiw it. I have not instructed contractors in the matter pending your reply. Chas. E. Vickerman, Eesident Engineer. Public Works Office, Auckland, sth August, 1893.

EXHIBIT No. 25. Memorandum for the Undeb-Secretary for Public Works. Makarau Tunnel.—l feel sure that delay is endangering the chance of getting this tunnel put through. There is no doubt that the effect of the water and air is not improving the ground at the heading and shaft, and that stops ought to be taken at once to have the tunnel carried on for at least chains. Contractors do not seem able to cope with the difficulty, and it would be advisable to have more experience and instruction as to what is considered the best way of excavating this class of ground. If you have an experienced tunnel hand in timbering and driving in what is more like porridge 110 ft. deep than anything else it would be well to have his opinion on it. Chas. E. Vickerman, Eesident Engineer. Public Works Office, Auckland, 27th January, 1894.

EXHIBIT No. 26. Memorandum for the Undee-Secbetaby for Public Woeks. Makaeau Tunnel.—Since writing to you memorandum No. 44/398, of the 27th January last, contractors have endeavoured to get a bottom heading driven through the creep. At first it seemed very bad, and a lot of water and slurry was met with ; but as they have got a little further in, better

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert