D.—l,
Takapuna-Junction AucMand-Maungaturoto Main Highway.—l m. of formation and metalling was carried out. Auckland-Helensville-Waiwera:—• Waitemata County : An extensive reconstruction programme was commenced, covering the following works :— On the section between Henderson and Lincoln Bridge, formation and base-course metalling were completed over a length of 1 m. 15 ch. Formation was completed over a length of 1 m. on Anderson's Deviation, in preparation for metalling and sealing. Preparation for sealing 62 ch. of the Kumeu-Huapai section was completed, and a contract let for the seal-coat. On the section between Yercoe's culvert and Helensville, spall base-course metalling is in hand. On the Helensville-Waiwera section, the metalling of the clay length is in hand. A contract was let for the erection of a reinforced concrete bridge over the Punganui Stream, and work is in progress. A contract was also let for the erection of Wright's Bridge. Helensville Town District: The reconstruction of a length of 43 ch. was carried out. Kumeu-Albany : A contract was let for the construction of the Riverhead Bridge, 246 ft. in length. Pokeno-Waihi:— Franklin County—Mangatawhiri Stream Diversion : During the year, the excavation of the canal from 4 m. 32 ch. to 5 m. 17 ch. was completed, and the length from 5 m. 17 ch. to sm. 24 ch. was completed to half-width. The stopbank from 4m. 32 ch. to sm. 12 ch. was completed, and the deviation to the Mangatawhiri Valley Road formed and metalled. Hauraki Plains County —Parry's- and Wilson's Road Corners : Formation of improved curvature at these two points has been completed. Ohinemuri County : Between Paeroa and Waihi, reconstruction and other improvements, particularly the regrading of Turner's Hill and Tarariki Hill, have been carried out. A length of 20 ch. adjoining the Paeroa Borough was sealed. Pipiroa-Coromandel.—Thames County—Waikawau Bridge : The construction of this bridge, of two 30 ft. and three 40 ft. spans in reinforced concrete, together with approaches, was carried out. Kopu-Raglan:— Thames County : The renewal of the piers and abutments of the Puriri Stream Bridge has been completed. Ohinemuri County : The length from Hikutaia to the Paeroa Borough has been sealed in one coat. From Paeroa to Te Aroha Borough reconstruction and shouldering are in hand. A length of 3m. 60 ch., south of Paeroa Borough, was sealed in one coat. The erection of a bridge of 22 ft. span over the Patuwhao Stream has been commenced. Piako County : A second seal-coat was applied between Te Aroha and Waitoa, a distance of 5 m. Waikato County : Tar-sealing from Newstead to the top of Hinton's Gully, a length of 2 m. 50 ch., was completed. Hinton's Gully Deviation : This deviation, covering a length of 71 ch., has been put in hand. Hamilton-Rotorua. —Matamata County : — Waihou and Waimakariri Bridges : These 60 ft. span rigid-frame reinforced concrete bridges have been completed. Tapapa-Mamaku Section: 2m. 2 ch. was sealed in two coats. Waitoa-Taupo (No. 2 District) :— Piako County : Lengths of 2m. at the northern end, and 2m. 8 ch. at the southern end, were sealed in two coats. Matamata County—Mangawhero Stream Bridge : A contract has been let for the construction of this bridge. Tirau-Tokoroa Section : The construction of a 16 ft. span bridge over the Whakauru Stream has been completed. Im. 73 ch., between Tirau and Putaruru, has received a first sealing-coat. Tokoroa-Atiamuri Section : 58 ch. was sealed in two coats. Matamata-Tauranga.—Matamata County : Contracts have been let for the erection of the Mangawhero Stream Bridge, and the construction of a deviation and approaches to the bridge. Papakura-Clevedon.—Manukau County —Black Bridge : The erection of this 35 ft. span bridge has been commenced. Ellerslie-Howick. —Panmure Road Board : 39 ch. was reconditioned and sealed. Tahuna-Ohinewai:—-Paiko County : A length of 2m. was sealed in two coats. Waikato County : The Nikau Swamp Bridge, a 9 ft. span in timber, has been completed. Te Aroha - Waharoa.—Piako County : A length of 92 ch. was sealed in two coats. Orongo-Netherton.—Hauraki Plains County : A 6 ft. concrete pipe culvert has been installed to replace a timber bridge. Te Awamutu-Barton's Corner.—Waipa County: Humphrey's and Milner's Deviations, total length 21-5 ch., have been completed. Te Awamutu - Cambridge.—Leamington Town District: 10 ch. was sealed in two coats. Henderson-Kumeu via Swanson. —Waitemata County : The Taupaki Bridge, of one 26 ft. reinforced concrete span, was completed.
122
Use your Papers Past website account to correct newspaper text.
By creating and using this account you agree to our terms of use.
Your session has expired.