D.—l.
The 5 m. length at the Pipiriki end, originally surfaced with shell rock spalls, was reconditioned and top-dressed with shingle. A contract was let for the renewal in reinforced concrete of the Mangateitei Stream Bridge in the Ohakune Borough. Wanganui-Karioi.—Wanganui County : 120 ft. of water tunnel and 8 ch. of realignment were carried out at 36 m. Reconstruction and metalling of Im. at the Wanganui end, preparatory to sealing, is in hand. Waverley Beach Highway.—Patea County : 10 ch. has been reconstructed, and metalling is in progress. Rapanui Highway. —95 ch. has been sealed. Turakina - Cliff Road via Marton.—Rangitikei County : The reconstruction and metalling of 38 ch. of the Ben Nevis Hill, near Turakina, have been completed. Waitotara Valley.—3s ch. near Parakama Junction has been widened. Wellington-Auckland via Taranaki (No. 9 District) : — Makara County— Tawa Flat - Porirua : The Porirua Township Bridge, of one 40 ft. span in steel and timber, was completed. Porirua-Paremata : 20 ch. of first-coat sealing was carried out. The deviating and metalling of this section over a length of 75 ch. are in hand. Formation has been completed over a length of 55 ch., and 12 ch. metalled. Hutt County—• Paekakariki-Waikanae : Realignment and widening were effected at Seddon's Corner, Paraparaumu. Between Paekakariki and Paraparaumu, surface depressions caused by swamp subsidence have been levelled up. Foxton Borough : At the railway crossing at the north end of the Borough, 20 ch. has been reconstructed and sealed. Manawatu County :— Himatangi-Sanson : A contract has been let for the road-mix surfacing of sm. Contracts were let and work commenced on the Piakatutu and Makowhai Bridges, between Sanson and Bulls. Wellington-Napier via Wairarapa (No. 9 District) : — Hutt County —Taita Gorge : 1 m. of plant-mix smoothing-coat was applied on the old sealed surface. Upper Hutt Borough : 20 ch. of the bituminous pavement was widened. Between Upper Hutt and the Rimutaka Summit, 5 m. 10 ch. of smoothing-coat was laid on existing sealed surfaces. Awahuri-Mangaweka via Kimbolton : — Feilding Borough : 25 ch. was sealed in one coat. Kiwitea County : A contract was let for the reconstruction and sealing of 3m. 72 ch., commencing at Cheltenham. Greatford-Woodville (No. 9 District) :— Oroua County : Between Feilding and Halcombe, a length of 75 ch. was sealed in one coat. The Mangaone Stream Bridge, of two 48 ft. reinforced concrete beam spans, was completed. Himatangi-Ashhurst via Palmerston North :— Manawatu County : Between Himatangi and Rangiotu, 6m. 35 ch. of road-mix surfacing was completed. Kairanga County : Three curves, totalling 23 ch. in length, between Palmerston North and Ashhurst, were reconstructed and sealed. Levin - Palmerston North via Shannon : — Horowhenua County : Preparation for sealing was completed over a length of 25 ch. The Mangaore Stream Bridge at Shannon, comprising two 30 ft. concrete beam spans, is in hand. Fitzherbert Bridge, Manawatu River, Palmerston North : This reinforced concrete bridge which comprises four 112 ft. bowstring spans and seven 55 ft. beam spans, with 22 ft. roadway and 5 ft. footway, has been in progress, and was completed in July of this year. The southern approach has been formed and metalled on new alignment over a length of 20 ch. Upper Hutt - WaiJcanae :— Hutt County : Widening was continued, 40 ch. being carried out during the year. Metalling was completed over a length of 1 m. 29 ch. Baigent's Bridge, of one 52 ft. reinforced concrete span, was completed. Waikanae-Waimea. —Horowhenua County : The realignment and metalling of seven corners, aggregating a length of 15 ch., was completed. Te Horn - Waihoanga.—Horowhenua County : Preparation and sealing were carried out over a length of 10 ch. Bunnythorpe-Kairanga.■ —Kairanga County : 2m. of one-coat sealing was completed. Pohangina "Valley — Apiti.—Pohangina County i A contract was let for the erection of the Porewa, Te Ekaou, and Opawe Bridges in reinforced concrete. Wellington-Napier via Wairarapa (No. 10 District) : — Featherston County: Between the Rimutaka Summit and Featherston, 2m. 42 ch. of smoothing-coat was applied. At the Waiohine Bridge, two permeable boom groynes were constructed for river-training. Masterton County : Between Mount Bruce Hall and the county boundary, 4m. 48 ch. of re-formation was completed, including 72 ch. of deviations. 4m. 28 ch. of this was sealed in one coat.
127
Use your Papers Past website account to correct newspaper text.
By creating and using this account you agree to our terms of use.
Your session has expired.