Page image
Page image

D.—l.

Patutahu-Rere: —• Cook County : 1 m. 31 oh. of formation and Jm. of metalling have been carried out. An old wooden bridge has been replaced by a 10 ft. by 6 ft. concrete culvert. Waikohu County : A 7 ft. by 6 ft. concrete culvert has been constructed. Takapau-Ihungia. —Waiapu County : The Makarika Stream bridge, comprising three 40 ft. steel-joist spans on concrete piers, with concrete deck, has been erected. Hicks Bay Wharf Highway. —The construction of a 250 ft. concrete bridge over the Wharekahika River was commenced. N apisr-G-isborm, via Wairoa, Hawke's Bay County : — Napier Borough Boundary to Te Ngaru Crossing : A deviation 40 ch. in length, avoiding the Whirinaki Hdl and eliminating six sharp curves, is nearing completion. Te Ngaru Crossing to Tutira : The widening of this section has been completed. Tutira to Waikare : Extensive widening and metalling have been carried out. Wairoa Borough : 67 ch. was reconstructed, and sealed in two coats. Napier-Wellington, via Wairarapa (No. 5 District) :— Hawke's Bay County : This section, which had broken up badly, was metalled for a length of If m. and sealed in two coats. A concrete bridge of 30 ft. span was built at Pakipaki, also a 6 ft. concrete pipe culvert, works which replaced two narrow wooden bridges. Waitangi Washout Bridge : This bridge, consisting of twenty 40 ft. concrete spans with a 24 ft. deck, together with its approaches, was completed. The bridge eliminates two levelcrossings. Waitangi Stream Bridge : The construction of this fifteen-span bridge is in progress. Waipawa County : A length of 3m. 21 ch., from Waipawa Borough to Otane, was reconstructed and sealed. Waipukurau County : The sealing of 2m. 66 ch. was completed. Dannevirke County : Manawatu Hill Deviation : The formation of this deviation, 66 ch. long, is nearing completion. Woodville County : A deviation of 4J ch. at Papatawa railway-crossing was completed. 1 m. of original sealed surfaces has been reconstructed, in preparation for improved surfacing. Rotorua-Napier (No. 5 District) : — Hawke's Bay County : Widening has been carried out between Maori G-ully and Te Pohue, and is in hand near Glengarry. Mohaka Bridge - Rangitaiki River : A 6 ft. by 4 ft. water-drive, 76 ft. long, was put in at Peka Creek, to replace the existing bridge. The Waipunga River Bridge, consisting of one 40 ft. and two 20 ft. steel-joist spans, was completed. Napier-Hastings, via Fernhill. —A contract for metalling and sealing sm. 10 ch., from the RedclyHe Bridge to Fernhill, was carried out. Otane-TukituM, via Elsthorpe. —Hawke's Bay County : A 40 ft. concrete bridge was constructed over the Oho Stream. Waipawa-Tikokino. —A length of Im. at the Waipawa end was reconstructed and sealed. Two-mile Creek Bridge : A contract has been let for the erection of this bridge. Waipawor-Ongaonga. —1 m. was sealed in one coat. Dannevirke-Waipukurau, via Porangah.au: — Waipukurau County : The contract for sealing Im. 59 ch. was completed, and a further contract let for 2 m. 76 ch., of which 2 m. 40 ch. has been completed. Patangata County : The Kokomoko Bridge, of one 40 ft. concrete span, was erected. Weber County Section, Morgan's Bridge and Approaches : Contracts for these works are in progress. Dannevirke-Waipukurau, via Porangahau.—Dannevirke County : 3m. of two-coat sealing was carried out. Hastings-Maraekakaho. —2| m. was reconstructed and metalled. Ruakituri Valley.—Te Reinga Bridge: The erection of a 278 ft. suspension bridge, to replace the existing bridge, is in hand. W aipawa-Pourerere: — Patangata County : The erection of Logan's Bridge was completed, the structure comprising three 45 ft. concrete spans. Two culverts of 11 ft. span were erected. via Hatuma :— Waipawa County : 1 m. through the Takapau Township has been sealed. Waipukurau County : 1 m. 55 ch. has been prepared, and a contract let for the sealing. Mangateretere - Te Awanga: — 2 m. at the Mangateretere end was reconstructed, and sealed in two coats. An 8 ft. span concrete culvert was put in at Muddy Creek. Petane-Eskdale. —This highway was reconstructed, and sealed in two coats. Takapau Saleyards:— This highway, 36 ch. in length, was reconstructed in preparation for sealing.

139

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert