Tiie major slip adjacent to No. 3 pipe-line continued to show movement, and it was not until the latter part of the year that a removal of the lower part of the slip was commenced. During January, February, and March, the opportunity was taken to completely overhaul No. 3 main machine. This maintenance work had bad to be postponed from the previous year owing to the power situation. In conjunction with this overhaul No. 3 penstock, 3,450 ft. in length and with a diameter varying from 78 in. to 66 in., was sand-blasted and painted internally with coal-tar paint. A roading alongside the penstock had been built to facilitate this work. Extensive alterations were made to the test switches on the control board at the Tuai Power-station. New networks were fitted to Nos. 3 and 5 machine voltage-regulators. The governor-locking solenoid and associated equipment of both Nos. 4 and 5 machines was removed. Satisfactory service was obtained from all machines.

Generating-running times were as follows for the year :

Mangahao Power-station.—The rainfall for the year at No. 1 dam was 110-26 in., compared with 188-74 in. and 198-05 in. in the previous two years. At No. 2 dam the rainfall was 104-29 in., at No. 3 dam 79-55 in., and at the power-house 47-94 in. The annual load factor dropped to 46 per cent, on a maximum load of 21,300 kW. Extensive cleaning and painting of steelwork at all dams was carried out. On 24th November the surge-chamber gates tripped, due to a sustained .overload when Tuai tripped out, and the pipe-lines emptied. All five turbine governors were completely overhauled and the oil renewed. Two more sets of bronze buckets were received. One set was fitted to No. 3 turbine, and this completed the change to new buckets on the three 6,000 kVA. units. The other set is reamed ready for fitting to No. 2 turbine.

Generator-running times were as follows :

A contract has been let for the supply of replacement gates for the by-pass tunnel of No. 1 dam. Negotiations are in hand for a contract for similar gates for No. 2 dam.

11

Generator No. Time oil Load. Time Idle. Time under Repair. Percentage Availability for Service. Honrs. Percentage. Hours. Percentage. Not in j Demand (Hours). In Demand (Hours). 1 Tuai 1 7,061 80-39 1,388 15-80 333 2 96-19 2 7,086 80-67 1,429 16-27 265 4 96-94 3 !! _ !! 5,637 64-17 1,223" 13-92 1,855 69 78-09 Piti'paua 4 5,870 66-83 2,486 28-30 424 4 | 95-13 5 5,840 66-49 2,473 28-15 421 50 94-64 1

Generator No. Time on Load. Time Idle. Time under Repair. Percentage Availability for Service. Hours. Percentage. Hours. Percentage. Not in Demand (Hours). In Demand (Hours). 1 8,274 94-2 475 5-4 35 99-6 2 8,304 94-5 434 4-9 46 99-4 3 8,168 93-0 396 4-5 220 97-5. 4 8,369 95-3 404 4-6 11 99-9 5 8,363 95-2 413 4-7 8 i 99-9

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert