D—4

B. OPERATION AND MAINTENANCE 1. Power-stations King's Wharf. —The station ran for the whole year except for two weeks in May. All boilers were surveyed. A new turbine rotor was fitted to No. 10 machine, and a new superheater was fitted to No. 15 boiler. Fuel was mainly of indifferent quality which gave rise to many problems in firing and caused a good deal of grit nuisance. Penrose. —This Diesel station was not on load except for testing purposes until March, when it commenced running for two shifts a day. Arapuni and Karapiro.—Arapuni: No. 2 generator went out of service on 6th January, 1950, for a major overhaul. Air-coolers have been installed for an enclosed air-cooling system. No. 6.generator was fitted with a new 35,000 b.h.p. turbine runner in April, and a new 24,000 kVA. stator in December. No. 2 auxiliary generating-set was given a complete overhaul. Over two-thirds of the 924 fiashboards on the main and extension spillway weirs were renewed. Chlorinating equipment for the village watersupply was installed in July. Karapiro : No. 3 generating-unit was shut down on several occasions in May, June, and July to inspect and repair a cracked blade on the 42,000 b.h.p. Kaplan type turbine. A new blade was fitted in July.

Generator-running times were :

Waikaremoana. —The lake-level reached 2009-9 ft. in August, 1949, and fell steadily to 1997-4 ft. at 31st March. In August, during heavy rains, a slip carried away a chain of the ground supporting the Mangaone Stream deviation pipes, and substantial slips occurred on various roads. Operation and control of Tuai Nos. 1, 2, and 3 headgates were changed over from D.C. to A.C. The interior of No. 1 pipe-line was sand-blasted and painted, extra manholes being fitted in the lower half. Manholes were also installed in No. 2 pipe-line. No. 1 generator and governor and No. 5 generator were completely overhauled. Alterations to bearings were made on Nos. 4, 6, and 7 machines to provide better oil usage. Bucholz relays and open-type 11 kY. terminals were fitted on two of the 11 /110 kV. transformers.

15

Generator No. Time on Load. Time Idle. Time under Repair. Percentage Availability for Service. Hours. Percentage. Hours. Percentage. Not in Demand (Hours). In Demand (Hours). Arajpuni 1 7,773 88-73 895 10-22 92 98-95 2 6,042 68-97 750 8-56 1,968 77-53 3 7,882 89-98 817 9-33 61 99-31 4 7,834" 89-43 810 9-25 ■ 57 59 98-68 5 7,608 86-85 872 9-95 280 96-80 6 6,683 76-29 723 8-25 1,354 84-54 7 7,532 85-98 931 10-63 297 96-61 8 7,766 88-65 905 10-33 83 6 98-98 Karapiro 1 7,130 81-39 1,582 18-06 I 48 99-45 2 7,157 81-70 1,585 18-09 18 99-79 3 .. .! 6,141 70-10 1,457 16-63 1,162 86-73

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert