PETROLEUM.
THE- NEW PLYMOUTH WORKS
* ' (Press Association.)
NEW PLYMOUTH, March 27. . " The water at the Hadley petroleum boro was effectually shut off at a depth of 1775 ft. This well has since been drilled to a greater, depth, the six-inch casing being lowered down to 1800 ft.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/GIST19090329.2.22.10
Bibliographic details
Ngā taipitopito pukapuka
Gisborne Times, Volume XXVII, Issue 2462, 29 March 1909, Page 5
Word count
Tapeke kupu
47PETROLEUM. Gisborne Times, Volume XXVII, Issue 2462, 29 March 1909, Page 5
Using this item
Te whakamahi i tēnei tūemi
The Gisborne Herald Company is the copyright owner for the Gisborne Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Log in