LYELL MINING.
(Times.) CRCESUS. Friday, May 36. This company's No 2 level contract will be completed by the end of the present month. A further distance of about 60 feet will bring the tunnel under where the winze from No. 1 level was started. I understand that it is intended to crosscut east and west, as it is thought that the tunnel has been driven alongside of the line of reef for some distance. The track of reef which was followed for a good length was left about 70 or 80 feet back, and was bearing to the westward of the line of tunnel. The contract for construction of paddock and quartz pass over No. 3 level was finished this week, and is a really substantial piece of work.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/IT18820605.2.8.2
Bibliographic details
Ngā taipitopito pukapuka
Inangahua Times, Volume VII, Issue 1096, 5 June 1882, Page 2
Word count
Tapeke kupu
129LYELL MINING. Inangahua Times, Volume VII, Issue 1096, 5 June 1882, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Log in