KAIRANGA-BUNNYTHORPE ROAD.
TAR SEALING. * The stretch of road from Milson s Line to Setter’s Line is being prepared for tar-sealing and the distance involved is one mile. A steam roller is at present rolling .the metal into place ana a month will transpire before the sealing operations are commenced. ,At the Bunnytliorpe end of Kai-ranga-Bunnythorpe road filling .and building .up Operations are in progress., tne object being to allow the metal to settle down firmly..
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/MS19320201.2.49
Bibliographic details
Ngā taipitopito pukapuka
Manawatu Standard, Volume LII, Issue 52, 1 February 1932, Page 6
Word count
Tapeke kupu
75KAIRANGA-BUNNYTHORPE ROAD. Manawatu Standard, Volume LII, Issue 52, 1 February 1932, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Log in