Page image
Page image

D.—l

Gisborne-Opotiki via Coast (No. 4 District) : — Cook County : A contract was let for the bituminous surfacing of 2m. Im. 65 ch. of reshaping and metalling was carried out, andjja seal-coat applied over 1 m. 40 ch. Uawa County : The contract for 6m. of reconstruction and bituminous penetration surfacing has been completed ; this year's work comprising 1 m. 72 ch. of base-course metalling, and 2m. 28 ch. of the penetration course. Farther north, 58 ch. of two-coat sealing has been carried out. Waiapu County : Two steel and concrete bridges, of 80 ft. and 40 ft. span, have been erected. Gisborne-Wairoa via Hangaroa (No. 4 District) : — Cook County : Im. of two-coat sealing has been completed. 70 ch. of reconstruction to improved gradients and curvature has been completed, and a further length of 2 m. is in hand. A concrete culvert of 10 ft. span has been constructed, to replace a timber bridge at 19-2 m. Harris Hill: The whole length of 3m. 24 ch. was regraded and realigned. Im. 23 ch. of base-course and 60 ch. of top-course metalling were carried out. Top-course metal was completed from Tiniroto to the Wairoa County Boundary, a distance of 3 m. 4 ch. Tokomaru Bay Wharf Highway. —A small bridge has been replaced by a 5 ft. by 4 ft. concrete culvert. Patutahi-Rere: — Cook County : At 5-7 m. a timber bridge has been replaced by a double 6 ft. by 6 ft. concrete culvert, and at 7-6 m. a similar bridge by a 3 ft. pipe culvert. The regrading and realignment of Ngatapa Hill has been commenced ; earthwork is in progress, and 37 ch. of base-course metal has been laid. Taurangakautuku Highway. —At 2-8 m. a timber bridge has been replaced by a 30 in. concrete pipe culvert. Napier-Gisborne via Wairoa (No. 5 District) : — Hawke's Bay County — Napier Borough-Te Ngaru Crossing: The Napier-Petane section has been improved, to a higher standard than pre-earthquake conditions, by the application of bituminous surfacing on a length of 6m. 15 ch.; 3m. 62 ch. consisting of road-mix, and the balance, including the deck of the Westshore Bridge, being sealed. Between Petane and Whirinaki 2 m. 76 ch. was metalled, and sealed in two coats. The highway is now bitumen-surfaced from the Napier Post-office to the Whirinaki Hill, a distance of 11 m. 35 ch.; 10 ch. of widening and 3 ch. of grade-elevation have been carried out at Tangoio. Te Ngaru Crossing - Tutira : Between the Elbow Ford and the top of the Waikoau Hill, 1| m. has been widened, and work is in progress round Lake Tutira. A 9 ft. by 9 ft. reinforced concrete culvert, 60 ft. long, was put in at the Elbow Ford. Tutira - Waikare River : 2m. of widening and curve-improvement have been carried out from the end of the Tutira Straight, and similar work is in hand as far as the Matahoura Gorge. Wairoa County — Mohaka Bridge - Morere : A small bridge at Waihua was replaced by a 5 ft. concrete pipe culvert on improved alignment. Ohinepaka Bridge : A reinforced concrete bridge, 99 ft. long, was completed, together with a small deviation. Wairoa Borough : 58 ch. of two-coat sealing was carried out. Napier-Wellington via Wairarapa (No. 5 District) :— Hawke's Bay County : A contract was let for the construction of the Waitangi Washout Bridge, 800 ft. long, and work has been commenced. A contract has been let recently for the Waitangi Stream Bridge, 600 ft. in length. Both these bridges consist of reinforced-concrete beam-spans. A contract was let for a bridge and culvert at Pakipaki to replace two narrow wooden bridges, and the work is in hand. A reinforced-concrete culvert, 11 ft. by 5 ft., was put in at Opapa. A 6 ft. by 4 ft. water-drive, 84 ft. long, was constructed to replace Sutton's Bridge. Waipukurau Borough : A contract was let for a new reinforced-concrete bridge of twenty 45 ft. spans, with a 22 ft. roadway and 4 ft. footway, over the Tuki Tuki River ; the bridge has now been completed, and was opened for traffic in June of this year. Waipukurau County : A contract was let for sealing this 4t\ m. section in one coat. A length of 1 m. 54 ch. has been completed. Dannevirke County —Mangatera Hill Deviation : This deviation, 22 ch. in length, which eliminates a hairpin bend, was constructed during the year. Woodville County : 12 ch. at the approach of the Ngawapurua Bridge was sealed in two coats. Lengths totalling 1 m. 30 ch. of the eleven-year-old existing sealing were reconstructed and sealed in two coats. Curvature was materially improved at the Papatawa Railway-crossing. Petane-Taupo : —• Hawke's Bay County (No. 5 District) : The Maori Gully Deviation, 39 ch. long, which eliminates two wooden bridges, several sharp bends, and a very steep grade, has been completed and metalled. A 6 ft. by 4 ft. water-drive 257 ft. long replaces the bridges. Taupo County (No. 3 District) — Mohaka Bridge - Taupo : A timber platform bridge was replaced by a 4 ft. culvert, and a sharp corner improved. • A contract was let for the erection of a new bridge over the Waipunga River, and work is in hand.

124

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert