Gisborne-Wairoa via Hangaroa (No. 5 District). —Wairoa County—Te Kura Stream Bridge: A reinforced concrete bridge 110 ft. long, with a 56 ft. arch span, was constructed. Napier-Tuki Tuhi via Fernhill: — Hawke's Bay County: 2m. 75 cli. of two-coat sealing was carried out, completing a sealed surface from the Hastings Borough to Fernhill. At the west end of the Tuki Tuki Bridge a deviation of 13 ch., including an 8 ft. by 6 ft. concrete culvert, is being constructed to improve the bridge approach. Taradale-Bissington:— Taradale Town District : 32 ch. has been sealed, completing the section. Hawke's Bay County : Hislop's Bridge has been replaced by a 6 ft. pipe culvert. Bicknell's Bridge, of one 27 ft. span in steel and concrete, has been completed. Otane-Tuki Tuki via Elsthorpe.—Hawke's Bay County : The construction of the Oho Bridge and 9 ch. of approaches was carried out. The bridge consists of one 40 ft. span in steel and concrete. Waipawa-Ongaonga. —1 m. was reconstructed and metalled preparatory to sealing. Dannevirke-Waipukurau via Porangahau : — Waipukurau County : Im. 55 ch. has been prepared for sealing, and a contract let for the work. Patangata County : Two small bridges were replaced with 5 ft. and 5 ft. 6 in. concrete pipe culverts, and a contract let for the erection of the Kokomoko Bridge. Weber County—Waipatiki Deviation : This deviation, 96 ch. in length, has been completed, metalled, and fenced. Dannevirke County : A length of 3m. has been metalled in preparation for sealing. Widening has been undertaken on the 4 m. hill and between 13 m. and 15 m. Greatford-W oodville (No. 5 District).—Woodville bounty : A length of 38 ch. of the original sealing was reconstructed and sealed in two coats. Hastings-Maraekakaho.—An 18 in. pipe culvert was put in at Bridge Pa, on improved alignment, replacing a narrow wooden bridge. Waipawa-Powerere: — Waipawa County : A small timber bridge was replaced by a 2 ft. concrete pipe culvert. Patangata County : A contract was let for the construction of Logan's Bridge over the Mangamahaki Stream. Woodville-Tamaki. —Dannevirke County : Widening, metalling, and two-coat sealing have been carried out over a length of 1 m. 49 ch. Makuri-Ongaha.—Dannevirke County : A bridge at 4-2 m. was replaced with a 2 ft. 6 in. concrete pipe culvert. Widening was undertaken on the hill section of the length om.to 3 m. Waipukurau-Matamau via Hatuma. —Waipawa County : The reconstruction and sealing of 1 m. through the Takapau Township was carried out. Mangateretere - Havelock North. — Havelock North Town District: This 60 ch. section was sealed in two coats. Hawke's Bay County : This section of 2m. 72 ch. was metalled, and sealed in two coats. A narrow concrete bridge was widened to 22 ft. Hastings-Pakipaki. —1 m. 47 ch. was reconstructed, metalled, and sealed in two coats. This completes the sealing of this highway. Tuki Tuki-Waimarama. —A 3 ft. concrete pipe culvert, 76 ft. long, was put in at Tawse's Corner, and 6 ch. of deviation constructed, improving a dangerous corner. Peach Gully Bridge, of 30 ft. span in steel and concrete, was erected. A contract has been let for a new bridge at Waipuka. Mangateretere - Te Awanga. —Two narrow bridges were replaced by 3 ft. concrete-pipe culverts and 40 ch. prepared for sealing. Petane-Eskdale. —This highway has been improved over a length of 1. m. 20 ch. by widening and cutting back sharp bends, in preparation for metalling and sealing. Auckland-Wellington via Taranaki (No. 6 District) : — Te Kuiti - Pio Pio Section : Reconstruction and metalling were carried out from 10 m. to 12 m. 30 ch. Pio Pio - Mahoenui Section : 3 m. 57 ch. near Mahoenui was sealed in one coat. Te Kuiti Borough : 1 m. 11 ch. on the Awakino Hill received a two-coat seal. Caves - Lemon Point.—Hangatiki - County Boundary Section : The cutting-back of corners and reconditioning were carried out over a length of 3 m. Te. Kuiti-Bulls via Taumarunui (No. 6 District) : — 8 m.: Tangitu Section — Kurakura Bridge : This bridge, 70 ft. long, in steel and concrete, together with 4 ch. of approaches, was completed. Manga,iti Turnoff — Mapiu Gates i Im. 50 ch.. of formation was completed, pumiced, and top-dressed with shingle. Mapiu Gates - Waimiha Turnofi : 1 m. of formation and 3m. of metalling were completed. Tapuiwahine TurnofE - Ohura Turnoff : 2m. 21 ch. of re-formation and culverting and 4 m. 45 ch. of metalling were completed. Owhango-Oio Section : 4m. 45 ch. of formation and culverting was completed. Stratford-Taumarunui (No. 6 District).— Aukopae Stream Bridge: This bridge, 70ft. long, in steel and timber, together with 4- ch. of approaches, was completed. Raurimu - Wade's Landing.—Taurimu Bridge : This bridge, 70 ft, long, in steel and timber, was completed.
125
Use your Papers Past website account to correct newspaper text.
By creating and using this account you agree to our terms of use.
Your session has expired.